Go live on your own telemetry in 90 days — book a working session
Lansub Technologies

Industries · Utilities and generating companies

health, ageing and audit evidence

Heat-rate drift, blade creep and hydraulic wear discovered at outage; compliance evidence assembled by hand.

100%of transformers with SCADA load get a health index
minutesto assemble an audit pack that took weeks by hand
1 ledgerfor alarms, decisions and compliance evidence
Hydroelectric dam and spillway

03 · Utilities and generating companies

Thermal & hydro generation

Heat-rate drift, blade creep and hydraulic wear discovered at outage; compliance evidence assembled by hand.

Modules

Fleet HealthAlarmsIncidentsReportsCompliance

Equipment classes

BoilerSteamTurbineGeneratorHydroUnitPenstockDam

Reference twins

  • Mundra Supercritical TPP · Gujarat2 × 660 MW supercritical units
  • Tehri Hydro Power Complex · Uttarakhand4 × 250 MW Francis · 1,000 MW PSP

Use case · Keep evidence for every excursion, automatically

  1. 1Boiler, turbine and generator tags with threshold alarms (hysteresis-gated) and per-tag data quality scores.
  2. 2Incidents are opened from alarms with SLA timers; playback reconstructs the twin state around the event.
  3. 3Reports and the compliance pack export the ledger entries, ratings and alarms for the audit window.

Outcome: compliance evidence assembled from the ledger rather than by hand; no more reconstructing timelines from historian exports.

Fleet Health — generation scope
Fleet Health — generation scopeFleet Health — generation scope
Live capture: Fleet Health across boilers, steam turbines, generators and hydro units — C57.91 ageing and ISO 10816 severity per unit.

Why it pays

100%of transformers with SCADA load get a health index
minutesto assemble an audit pack that took weeks by hand
1 ledgerfor alarms, decisions and compliance evidence

What changes for your team

  • Heat-rate drift and hot-spot ageing surfaced between outages, not at them
  • Playback reconstructs the twin around any excursion for the report
  • Compliance packs cite the same events operators acted on
Digital Twin · 3D Site Twin · Mundra Supercritical TPP
Digital Twin · 3D Site Twin · Mundra Supercritical TPPDigital Twin · 3D Site Twin · Mundra Supercritical TPP
Live capture: 3D site twin of Mundra Supercritical TPP (2 × 660 MW supercritical units) with equipment status and sensor pins.

See it running on the reference twins — or on a sanitised slice of your own telemetry. Try the live SCADA & 3D demo

Request a demo

See Digital Twin on your own network data.

A 45-minute working session with our grid engineers on a sanitised slice of your topology and telemetry, followed by a scoped 90-day pilot proposal.