Go live on your own telemetry in 90 days. Book a working session.
Lansub Technologies

Industries · Utilities and generating companies

health, ageing and audit evidence

Heat-rate drift, blade creep and hydraulic wear discovered at outage; compliance evidence assembled by hand.

100%of transformers with SCADA load get a health index
minutesto assemble an audit pack that took weeks by hand
1 ledgerfor alarms, decisions and compliance evidence
Hydroelectric dam and spillway

03 · Utilities and generating companies

Thermal & hydro generation

Heat-rate drift, blade creep and hydraulic wear discovered at outage; compliance evidence assembled by hand.

Modules

Fleet HealthAlarmsIncidentsReportsCompliance

Equipment classes

BoilerSteamTurbineGeneratorHydroUnitPenstockDam

Reference twins

  • Mundra Supercritical TPP · Gujarat2 × 660 MW supercritical units
  • Tehri Hydro Power Complex · Uttarakhand4 × 250 MW Francis · 1,000 MW PSP

Use case · Keep evidence for every excursion, automatically

  1. 1Boiler, turbine and generator tags with threshold alarms (hysteresis-gated) and per-tag data quality scores.
  2. 2Incidents are opened from alarms with SLA timers; playback reconstructs the twin state around the event.
  3. 3Reports and the compliance pack export the ledger entries, ratings and alarms for the audit window.

Outcome: compliance evidence assembled from the ledger rather than by hand; no more reconstructing timelines from historian exports.

Fleet Health — generation scopelive capture
Fleet Health — generation scopeFleet Health — generation scope
Live capture: Fleet Health across boilers, steam turbines, generators and hydro units — C57.91 ageing and ISO 10816 severity per unit.

Why it pays

100%of transformers with SCADA load get a health index
minutesto assemble an audit pack that took weeks by hand
1 ledgerfor alarms, decisions and compliance evidence

What changes for your team

  • Heat-rate drift and hot-spot ageing surfaced between outages, not at them
  • Playback reconstructs the twin around any excursion for the report
  • Compliance packs cite the same events operators acted on
Digital Twin · 3D Site Twin · Mundra Supercritical TPPlive capture
Digital Twin · 3D Site Twin · Mundra Supercritical TPPDigital Twin · 3D Site Twin · Mundra Supercritical TPP
Live capture: 3D site twin of Mundra Supercritical TPP (2 × 660 MW supercritical units) with equipment status and sensor pins.

Case study · reference twin

Reference deployment · Mundra supercritical unit evidence pack

A 660 MW unit takes a main-steam temperature excursion during a load ramp. The compliance team needs the full picture — what the operators saw, did, and when.

  • Hysteresis-gated alarms open an incident with SLA timers automatically
  • Playback reconstructs the twin state around the excursion, tag by tag
  • The compliance pack assembles ledger entries, ratings and alarms for the audit window

Runs end-to-end on the Mundra Supercritical TPP reference twin (Gujarat) — real geography and plant configuration, synthetic telemetry. Reproduce every number in the live demo.

minutesto assemble evidence that took days from historian exports
1 timelineoperators, alarms and process data on the same clock
7 yrtamper-evident retention via the hash-chained ledger

Implementation

Live in 90 days, advisory-first.

Read-only: unit DCS/historian tags, transformer SCADA load data, existing alarm lists imported for tuning.

01

Weeks 1–3 · Connect

Unit historians connected; boilers, turbines, generators, GSUs and hydro units modelled with their standards.

Exit · Live unit dashboards, per-tag quality

02

Weeks 4–8 · Model & baseline

C57.91 ageing on transformers, heat-rate baselines per unit, hysteresis-gated alarms replacing flood-prone thresholds.

Exit · Health index for every unit with load data

03

Weeks 9–12 · Advisory live

Incidents with SLA timers, playback for excursion review, first compliance pack generated from the ledger.

Exit · Audit pack accepted by your compliance team

Value & ROI

Estimate your case — thermal & hydro generation numbers only.

Defaults below are the reference figures for this industry; drag the sliders to your fleet. The full calculator with every industry is on the Value & ROI page.

Heat-rate & availability recovery

Avoided forced outages

Illustrative annual value

Capacity recovered
18 MW avg
USD 3.24 M / yr
Outage hours avoided
288 h
USD 4.32 M / yr
Total
USD 7.56 M
per year, before subscription

Compliance packs assemble the evidence for every excursion from the same ledger — the audit time saved is on top of these streams. The 90-day pilot replaces every assumption here with measured numbers from your telemetry and recommendations marked realized.

See it running on the reference twins — or on a sanitised slice of your own telemetry. Try the live SCADA & 3D demo

Request a demo

See Digital Twin on your own network data.

A 45-minute working session with our grid engineers on a sanitised slice of your topology and telemetry, followed by a scoped 90-day pilot proposal.